Latest Projects
Bodrum Artificial Beach
The planning and protection of the artificial beach area in the Bodrum district were designed.
Muğla Rain Drainage and Artificial Beach
Planning for the development/improvement of the existing beach area with an artificial beach and the structural application works required for the discharge of rain water drainage in the residential area to the open sea area were designed.
Thermal Power Plant Cooling Water Discharge System
Thermal Power Plant Investigation of Hydraulic Condition of Cooling Water Discharge System and Investigation of Precautions
Avcılar Power Plant Cooling Water Discharge System
The project has been prepared in order to examine the compliance of the current state of the cooling water sea discharge systems with the legislation.